Hartz Mountain Facility
ASBESTOS ABATEMENT
Asbestos abatement of roofing material, floor tile, pipe insulation and mastic throughout the 10 structures located at the Former Hartz Mountain Facility .
DEMOLITION
Complete structure demolition of Buildings 0-9 for a total of over 1,000,000 SF. Hot and warm spot PCB contaminated concrete removal throughout all 10 structures. Demolition utilizing hydraulic excavators equipped with shears, grapples and hydraulic hammers.
RECYCLING
Over 40,000 cubic yards of clean concrete and masonry building rubble resulting from the demolition was crushed on-site and utilized for backfill and site grading.
SITE REMEDIATION
Excavation and disposal of over 36,000 tons of PCB contaminated soil. Gramercy installed sheeting, shoring and dewatering in order to excavate 30’ deep.
SITE WORK
Backfilling of the Former Hartz Mountain Facility utilizing material crushed on-site in order to fill voids created from the demolition and excavation back to surrounding grade.