Roberto Clemente Park Contamination Site Cleanup
SITE PREPARATION
Gramercy provided the following site preparation measures in order to facilitate the excavation.
- Silt fence
- Hay bales
- Truck wash station
- Truck scale
- Specialty windscreens
ASBESTOS ABATEMENT
Excavation, loading and disposal of 50,000 tons of asbestos contaminated soil. 18,000 tons of the material was disposed of off-island to a licensed facility. 32,000 tons of the material was disposed of at Islip’s local landfill.