Hicksville Parking Garage
ASBESTOS ABATEMENT
Asbestos abatement of floor tiles, caulking and other miscellaneous asbestos containing materials.
DEMOLITION
Complete structure demolition of the former Hicksville Parking Garage totaling approximately 500,000 SF. Demolition utilizing hydraulic excavators equipped with shears, grapples and hydraulic hammers.
RECYCLING
Concrete rubble derived from the demolition was crushed on-site. Approximately 15,000 cubic yards of concrete was crushed on site and utilized for backfill.
SITE REMEDIATION
Crushed concrete derived from the demolition was utilized for backfilling the below grade parking levels. The site was backfilled flush to adjacent grade and compacted.